Project Detail:
Adress: Tan Thanh – Ba Ria – Vung Tau
Contractor: Toa Group -Toyo Group cooperation
Package:
- Static load test offshore, capacity load test 1100 Ton: 04 piles
- Driving test pile pressure concrete diameter 700mm.
- Driving test pile steel pipe pile diameter 1100 mm: 3 piles, 2 piles Diameter 1000mm, 2 piles Diameter 812mm.
Completed time: 03 months.