Static Load Test Offshore International Cai Mep Port – ODA 1

Name: Static Load Test Offshore International Cai Mep Port - ODA 1
Schedule: Completed
Year: 2010
Project Detail:

Adress:  Tan Thanh – Ba Ria – Vung Tau

Contractor: Toa Group -Toyo Group cooperation

Package:

  • Static load test offshore, capacity load test 1100 Ton: 04 piles
  • Driving test pile pressure concrete diameter 700mm.
  • Driving test pile steel pipe pile diameter 1100 mm: 3 piles, 2 piles Diameter 1000mm, 2 piles Diameter 812mm.

Completed time: 03 months.