Công ty TNHH Xây Dựng và Thi Công Cơ Giới Minh Phóng
Minh Phong Construction Limited Company

Vietnam Construction

VIETNAM PROJECT

With modern equipment resources, a regular, creative and experienced construction team, Minh Phong has been very successful in building a brand that shows difference, proving the capacity of a leading enterprise.

Since its establishment, the company has constructed most key projects in Vietnam such as Dung Quat Oil Refinery Port – Quang Ngai, Nghi Son Thanh Hoa Oil Refinery Port, SP-PSA International Port , Thi Vai General Port (Ba Ria, Vung Tau), Vissai Cua Lo Cement Factory Port – Nghe An, Thien Minh Duc Oil Port (Nghe An), Phu Quoc International Passenger Port, Lach Huyen Port, Hai Phong District – Package No. 06, Petrol Vietnam Metal Structure Port,  Bac Lieu Wind Power Plant Power Pole…with major domestic and international partners: PTSC Company, PVC-IC Company, Cienco 1 Company, Cienco Company 4, Cienco 6 Company, Truong Son Army Corps,  Penta Ocean Construction Group, Toa Construction Group, HSL-Singapore Construction Group, Rinkai Construction Group…

Long Son Oil Refinery – Vung Tau

Adress:  Long Son – Ba Ria – Vung Tau Investor: HSL-Singapore Construction Company Package: Static load test, tension test – Capacity 1100 Ton Completed time: 2019.

Vam Co general port – Dong Nai

Adress:  Nhon Trach – Dong Nai Investor: Phuc An Thanh company Package: Construction of test piles and mass piles, prestressed concrete piles, diameter 600mm, 800mm: 372 piles Completed time: 09 months.

Product Export Port of Nghi Son Thanh Hoa Oil Refinery

Adress:  Nghi Son Economic Zone, Thanh Hoa Investor: PTSC Vietnam Petroleum Services Joint Stock Company Package: Construction of steel piles with diameters of 812mm and 916 mm: 640 piles Completed…

Phu Quoc International Passenger Port

Adress:  Duong Dong, Phu Quoc, Kien Giang Investor: Department of Transport of Kien Giang province Package:  Driving reinforced concrete test piles with diameter of 1000 mm: 37 piles Driving prestressed…

Cua Lo Port – Nghe An

Adress:  Nghi Thiet, Nghe An Investor: CIENCO4 Group Joint Stock Company Package: Driving steel piles with diameter of 812.8mm,Prestressed concrete piles with diameters of 800mm & 600 mm: 295 piles…

Lach Huyen Port – Hai Phong – Package 06

Adress:  Cat Hai, Lach Huyen, Hai Phong Main Contractor:  Penta Ocean – Toa cooperation Package: Driving steel sheet piles with diameter of 800mm: 948 Piles Completed time: 05 months

X51 Factory Port-Nha Be

Adress:  Nha Be, Ho Chi Minh City Main contractor: Thanh An construction company Package: Driving by hydraulic hammer 12.5-ton capacity, 500×500 square concrete pile Completed time: 05 months

General Port Thi Vai ODA2 – Ba Ria – Vung Tau

Adress:  Tan Thanh, Ba Ria, Vung Tau Contractor:  Penta Ocean Group –  Rinkai Group cooperation Package: Driving pressure concrete diameter 700mm, 800mm, steel pile diameter 800, 900, 1000: 32.211 meter Completed…

Bac Lieu Wind Power Factory

Adress:  Vinh Trach Dong, Bac Lieu Contractor: Cong Ly company Package: Driving pressure concrete diameter 600, 800: 10.000 m Contruction structure of foundation: Total Volume Concrete 4.126 m3  Completed time: 08 months.

Refinery Port Dung Quat-Quang Ngai

Adress:  Economic zones Dung Quat, Quang Ngai Contractor: Traffic Works Construction Corporation 1 Vietnam Petroleum Services Joint Stock Company PTSC Package: Driving Steel Pile Diameter 609.6mm, Ranke 1:4, Total volume…

Port oil and Gas Metal Warehouse

Adress:  Thang Nhat, Vung Tau City Investor: PVC-IC Company Package: Driving test pile of pressure concrete diameter 800mm: 12 piles Driving permanent pile of pressure concrete diameter 800 mm: Total volume 33.560…

Static Load Test Offshore International Cai Mep Port – ODA 1

Adress:  Tan Thanh – Ba Ria – Vung Tau Contractor: Toa Group -Toyo Group cooperation Package: Static load test offshore, capacity load test 1100 Ton: 04 piles Driving test pile pressure concrete…

SP-PSA Port (Thi Vai – Vung Tau)

Adress:  Tan Thanh – Ba Ria – Vung Tau Main Contractor: Penta – Ocean Group Package:  Driving pressure concrete diameter 700mm and 900mm, total volume 41.000 m (D700mm), 9000 (D900mm). Completed time:…

Static Load Test offshore Cái Mép-Posco International Port

Adress:  Tan Thanh – Ba Ria – Vung Tau Contractor: Chosuk Contruction company Package: Static Load Test offshore, load capacity 1100 Ton, 4 piles Completed time: 03 Months.

PV-GAS Port

Adress:  Factory zones Cai Mep, Tan Thanh – Ba Ria – Vung Tau Investor: PVC-IC Company Package: Driving steel pipe pile diameter 812 mm: 4.600 m Completed: 03 months

Thermal power plants Ô Môn – Cần Thơ

Adress:  Tan Thanh – Ba Ria – Vung Tau Investor:  VINAWACO company Package: Driving pressure concrete diameter D500, 600, 700, 800 mm: 13.928 m Completed time: 07 Months.